-
An operational review of Part 6 of the Code - second consultation
Closed
03 Dec 2013 – 31 Jan 2014
103 submissions received (view submissions)
This is the second consultation paper published for our operational review of Part 6 of the Code.
Part 6 relates to the connection of distributed generation (DG). The first consultation paper proposed:
- a new, streamlined notification process for connecting standards-compliant small-scale distributed generation (SSDG) to local networks (Part 1A of Schedule 6.1)
- a range of technical and operational Code amendments throughout Part 6, aimed at clarifying the drafting of Part 6 and addressing a number of other concerns.
After consideration of the submissions received on the first consultation paper, we have revised a small number of the proposals. In particular, we now propose:
- a revised proposal for Part 1A of Schedule 6.1 that requires the approval of the distributor prior to connection but significantly shortens the window in which the distributor may consider the application
- revised drafting to other Part 6 clauses.
We now seek submissions on a small number of questions relating to these revised proposals.
Consultation Papers
-
Download a ZIP file containing all documents
-
Appendix A - Format for submissions
Appendix-A-Format-for-submissions.docx (DOCX, 45 KB)
Last updated: 25 June 2015
-
Appendix B - Part 1 proposed Code amendments
AppendixB-Part1.pdf (PDF, 57 KB)
Last updated: 18 August 2016
-
Appendix B - Part 11 proposed Code amendments
AppendixB-Part11.pdf (PDF, 10 KB)
Last updated: 18 August 2016
-
Appendix B - Part 17 proposed Code amendments
AppendixB-Part17.pdf (PDF, 10 KB)
Last updated: 18 August 2016
-
Appendix B - Part 6 proposed Code amendments
AppendixB-Part6.pdf (PDF, 354 KB)
Last updated: 18 August 2016
-
Consultation Paper - An operational review of Part 6 of the Code - second consultation
Consultation-paper.pdf (PDF, 253 KB)
Last updated: 18 August 2016
Summary of submissions
-
Decisions and reasons paper
Part6-decisionsandreasons-1.pdf (PDF, 1.2 MB)
The tracked and clean copies of the Code amendment at Appendices B and C of the Decisions paper are not official versions of the Code amendment that comes into effect on 23 February 2015. They are provided to assist participants preparing to implement the Code amendment. If there is any discrepancy between the copies of the Code amendment at Appendices B and C of the Decisions paper, and the Code amendment that was signed on 18 August 2014, the signed Code amendment takes precedence.
Last updated: 17 August 2016
-
Summary of submissions
Part-6-summary-of-submissions.pdf (PDF, 2.2 MB)
Last updated: 17 August 2016
Submissions
-
Download a ZIP file containing all documents
-
6 Confidential submissions have not been published
6-Confidential-submissions-have-not-been-published-2.pdf (PDF, 48 KB)
Last updated: 17 August 2016
-
Adrian Feasey
Adrian-Feasey.pdf (PDF, 15 KB)
Last updated: 17 August 2016
-
Alex Mitcalfe
Alex-Mitcalfe.pdf (PDF, 46 KB)
Last updated: 17 August 2016
-
Alicia Warren
Alicia-Warren.pdf (PDF, 15 KB)
Last updated: 17 August 2016
-
Alpine Energy
Alpine-Energy.pdf (PDF, 496 KB)
Last updated: 17 August 2016
-
Andrew Massie
Andrew-Massie.pdf (PDF, 24 KB)
Last updated: 17 August 2016
-
Ann Mitcalfe
Last updated: 17 August 2016
-
Anna Hughes
Last updated: 17 August 2016
-
Barbara Gillatt
Barbara-Gillatt.pdf (PDF, 37 KB)
Last updated: 17 August 2016
-
Ben Whitmore
Last updated: 17 August 2016
-
Operational review of Part 6
Closed
04 Sep – 30 Oct 2012
24 submissions received (view submissions)
Part 6 of the Code deals with the connection of distributed generation (DG) to distribution networks. The matters covered in Part 6 were previously set out in the Electricity Governance (Connection of Distributed Generation) Regulations 2007.
The consultation paper has three main elements:
- A consultation on proposed changes to Part 6, with associated changes to Parts 1 and 17. The key proposal within this section proposes that a simpler notification process be created for connection of DG that meets certain criteria.
- A discussion on issues relating to the connection of DG.
- A response to submissions received during the pre-consultation on connection of DG.
Consultation Papers
-
Download a ZIP file containing all documents
-
Appendix A - Operational Review of Part 6
Appendix-A-Operational-Review-Part6.docx (DOCX, 48 KB)
Last updated: 27 June 2015
-
Appendix C - Operational Review of Part 6
Appendix-C-consultation-paper-Operational-Review-Part6.pdf (PDF, 375 KB)
Last updated: 19 August 2016
-
Consultation Paper - Operational Review of Part 6
Consultation-paper-Operational-Review-of-Part-6.pdf (PDF, 1.2 MB)
Last updated: 19 August 2016
Summary of submissions
-
Summary of submissions
Summary-of-submissions-Part-6-review.pdf (PDF, 1002 KB)
Last updated: 25 June 2015
Submissions
-
Download a ZIP file containing all documents
-
Alphatron Pacific
Alphatron-Pacific.pdf (PDF, 169 KB)
Last updated: 18 August 2016
-
Aurora Energy
Aurora-Energy.pdf (PDF, 175 KB)
Last updated: 18 August 2016
-
B Wood
Last updated: 18 August 2016
-
Buller Electricity
Buller-Electricity.pdf (PDF, 272 KB)
Last updated: 18 August 2016
-
Contact Energy
Contact-Energy.pdf (PDF, 276 KB)
Last updated: 26 June 2015
-
D Clarkson
Last updated: 18 August 2016
-
Genesis Energy
Genesis-Energy.pdf (PDF, 84 KB)
Last updated: 18 August 2016
-
MainPower NZ
MainPower-NZ.pdf (PDF, 276 KB)
Last updated: 18 August 2016
-
Meridian Energy
Meridian-Energy.PDF (PDF, 74 KB)
Last updated: 18 August 2016
-
Mighty River Power
Mighty-River-Power.pdf (PDF, 65 KB)
Last updated: 18 August 2016
-
Pre-consultation: Connection of distributed generation
Closed
11 Oct – 11 Nov 2011
16 submissions received (view submissions)
The purpose of this pre-consultation is to provide an opportunity for stakeholders to inform us of any options or issues they believe should be included in formal consultation later in 2011. It is hoped that by providing an opportunity for input now, the number of formal consultations can be minimised.
The general purpose of Part 6 of the Code is to "enable connection of distributed generation if connection is consistent with connection and operation standards".
We are reviewing Part 6 because it is aware of some specific issues, and for reasons of general good regulatory practice.
Part 6 of the Code replaced the Electricity Governance (Connection of distributed generation) Regulations 2007, effective 1/11/10. This is the first review of either the Regulations or Part 6.
NOTE: Following requests from participants, we have decided to extend the deadline for submissions until 5:00pm on Friday 11 November 2011.
Consultation Papers
-
Pre-consultation paper
Preconsultation-paper.pdf (PDF, 132 KB)
Last updated: 19 August 2016
Submissions
-
Download a ZIP file containing all documents
-
Able Solar
Last updated: 27 June 2015
-
Alphatron
Last updated: 27 June 2015
-
Annette Sharp
Last updated: 27 June 2015
-
Black Diamond Technologies
Black-Diamond-Technologies.pdf (PDF, 587 KB)
Last updated: 27 June 2015
-
Industrial Research Limited
Last updated: 27 June 2015
-
MainPower New Zealand
Last updated: 27 June 2015
-
Meridian Energy
Last updated: 27 June 2015
-
Mighty River Power
Mighty-River-Power.pdf (PDF, 1 MB)
Last updated: 27 June 2015
-
Network Waitaki
Network-Waitaki.pdf (PDF, 54 KB)
Last updated: 27 June 2015
-
Orion New Zealand
Last updated: 27 June 2015
-
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
© 2023 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.