Consultations
-
Proposed actions regarding 26 March 2011 UTS
Closed
15 – 21 Jun 2011
12 submissions received (view submissions)
Under Part 5 of the Electricity Industry Participation Code (the Code), the Authority is responsible for investigating any suspected or anticipated undesirable trading situations (UTS). If the Authority finds that a UTS is developing or has developed, it may take steps in regard to that UTS.
The Authority has reached a final decision that the situation existing on 26 March 2011 constitutes a UTS. The reasons for the Authority's decision are set out in the decision document which is at appendix A of the Consultation Paper. The decision document also sets out the proposed actions that the Authority intends to take to correct the UTS.
Clause 5.4 of the Code provides that if the Authority finds that a UTS has developed, the Authority must immediately advise all registered participants of its findings, and of any actions that the Authority intends to take to correct the UTS.
The Authority invites submissions on the actions the Authority proposes to take to correct the UTS. To avoid doubt, the Authority is not consulting on its final decision.
Consultation Papers
-
Download a ZIP file containing all documents
-
Consultation paper on proposed actions to correct 26 March 2011 UTS
Consultation-paper-on-proposed-actions-UTS-15Jun11.pdf (PDF, 43 KB)
Last updated: 19 August 2016
-
Draft remedial pricing
Draft-remedial-pricing-15Jun11.xls (XLS, 634 KB)
Last updated: 28 June 2015
-
Summary of UTS decision and related matters
Summary-UTS-decision-and-related-matters-15-Jun11.pdf (PDF, 22 KB)
Last updated: 19 August 2016
-
UTS Committee Final Decision and Proposed Actions
Final-Decision-and-Proposed-Actions.pdf (PDF, 486 KB)
NB: This version of the UTS Committee Final Decision and Proposed Actions differs from the original version posted to correct a typographical error. The typographical error was the inclusion of the word “not” where it appeared for the second time in paragraph (a) of page 2 of the document under the heading “Claims not upheld”. In addition, there have been some minor editorial changes to the UTS decision published on 15 June 2011.
Last updated: 19 August 2016
-
UTS Final Decision Qs and As
QAs-UTS-Final-Decision.pdf (PDF, 37 KB)
Last updated: 19 August 2016
Summary of submissions
-
Summary of decision on actions to correct 26 March UTS
Summary-of-decision-on-actions-to-correct-26-March-UTS.pdf (PDF, 28 KB)
Last updated: 19 August 2016
Submissions
-
Download a ZIP file containing all documents
-
Air New Zealand
Last updated: 28 June 2015
-
Bryan Leyland Consulting
Bryan-Leyland-Consulting.pdf (PDF, 14 KB)
Last updated: 19 August 2016
-
Contact Energy Limited
Contact-Energy.pdf (PDF, 653 KB)
Last updated: 19 August 2016
-
Genesis Energy
Genesis-Energy.pdf (PDF, 278 KB)
Last updated: 28 June 2015
-
King Country Energy
King-Country-Energy.pdf (PDF, 3.6 MB)
Last updated: 28 June 2015
-
Meridian Energy
Last updated: 28 June 2015
-
Mighty River Power Limited
Mighty-River-Power.pdf (PDF, 85 KB)
Last updated: 19 August 2016
-
New Zealand Steel Limited
Last updated: 19 August 2016
-
Norske Skog Tasman
Norske-Skog-Tasman.pdf (PDF, 100 KB)
Last updated: 19 August 2016
-
NZX Limited
Last updated: 19 August 2016
-
-
Draft decision regarding alleged UTS on 26 March 2011
Closed
06 – 13 May 2011
21 submissions received (view submissions)
Under Part 5 of the Electricity Industry Participation Code (the Code), the Authority is responsible for investigating any suspected or anticipated undesirable trading situations (UTS). If the Authority finds that a UTS is developing or has developed, it may take steps in regard to that UTS.
The Authority has reached a preliminary finding that the situation existing on 26 March 2011 constitutes a UTS. The reasons for the preliminary finding are set out in the draft decision document which is at appendix A of the Consultation Paper. The draft decision document also sets out the draft remedial actions that the Authority intends to take to correct the UTS.
Clause 5.4 of the Code provides that if the Authority finds that a UTS has developed, the Authority must immediately advise all registered participants of its findings, and of any actions that the Authority intends to take to correct the UTS.
The Authority invites submissions on the Authority's draft decision and the draft remedial actions that the Authority intends to take to correct the UTS.
Consultation Papers
-
Download a ZIP file containing all documents
-
Draft decision
draft-decision.pdf (PDF, 990 KB)
Last updated: 19 August 2016
-
Draft remedial pricing
DraftremedialpricingHLY.xls (XLS, 955 KB)
Last updated: 28 June 2015
-
Marginal cost calculator
Marginal-cost-calculator.xls (XLS, 370 KB)
Last updated: 28 June 2015
-
Special Market Brief: Summary of the draft decision
draft-decision-summary.pdf (PDF, 59 KB)
Last updated: 19 August 2016
-
UTS draft decision consultation paper
Consultation-paper.pdf (PDF, 168 KB)
Last updated: 19 August 2016
Cross submissions
-
Download a ZIP file containing all documents
-
Cross submission - Contact Energy
Cross-ContactEnergy.pdf (PDF, 662 KB)
Last updated: 19 August 2016
-
Cross submission - Employers & Manufacturers Association
Last updated: 19 August 2016
-
Cross submission - Genesis Energy
Cross-GenesisCover.pdf (PDF, 136 KB)
Last updated: 19 August 2016
-
Cross submission - Genesis Energy attachment
Cross-GenesisAttachment1.pdf (PDF, 373 KB)
Last updated: 19 August 2016
-
Cross submission - Meridian Energy
Cross-MeridianCover.pdf (PDF, 913 KB)
Last updated: 28 June 2015
-
Cross submission - Meridian Energy attachment
Cross-MeridianAttachment1.pdf (PDF, 49 KB)
Last updated: 19 August 2016
-
Cross submission - Mighty River Power
Last updated: 19 August 2016
-
Cross submission - Mighty River Power attachment
Cross-MRPAttachment1.pdf (PDF, 383 KB)
Last updated: 19 August 2016
-
Cross submission - New Zealand Steel
Cross-NewZealandSteel.pdf (PDF, 90 KB)
Last updated: 28 June 2015
-
Cross submission - Norske Skog Tasman
Cross-NorskeSkogTasman.pdf (PDF, 98 KB)
Last updated: 19 August 2016
Submissions
-
Download a ZIP file containing all documents
-
Bryan Leyland
Last updated: 19 August 2016
-
Contact Energy Limited
ContactEnergy.pdf (PDF, 650 KB)
Last updated: 19 August 2016
-
Fletcher Building Limited
FletcherBuildingLimited.pdf (PDF, 357 KB)
Last updated: 28 June 2015
-
Genesis Energy
Genesis-Energy.pdf (PDF, 793 KB)
Last updated: 19 August 2016
-
King Country Energy
Last updated: 28 June 2015
-
Major Electricity Users' Group
Last updated: 19 August 2016
-
Meridian Energy - cover letter
Meridian-Part1.pdf (PDF, 404 KB)
Last updated: 19 August 2016
-
Meridian Energy attachment
Meridian-Part2.pdf (PDF, 76 KB)
Last updated: 19 August 2016
-
Mighty River Power
MightyRiverPower.pdf (PDF, 397 KB)
Last updated: 19 August 2016
-
New Zealand Refining Company
Last updated: 19 August 2016
-