-
Consultation on ACOT payments to distributed generation
Closed
16 Sep – 25 Nov 2022
28 submissions received (view submissions)
The Authority is proposing to amend the Code to make it clear that payments by distributors to eligible distributed generation for avoided cost of transmission (ACOT) are no longer required.
The proposed changes are consistent with the new transmission pricing methodology (TPM), and work with it to deliver significant benefits to consumers and support New Zealand’s transition to a low-emissions economy. The Authority considers that the current ACOT payments are inefficient. They lead to transmission costs shifting between regions, without significantly reducing transmission investment by Transpower. Removing ACOT payments would:
- Reduce the overall cost of electricity for consumers – ACOT payments cost consumers around $35m in the 2021 pricing year
- Promote competition by levelling the playing field between distributed generation, grid-connected generation and other grid support options for Transpower.
The consultation presents two options:
- Removing all provisions for ACOT payments from April 2023 (the Authority’s preferred option) or
- Phasing out the ACOT payments over the next two pricing years.
The consultation period was from 16 September to 3 November 2022. Thank you to everyone who made a submission.
Update: Following receipt of cross-submissions, the Authority put further questions to Transpower, as Grid Owner, on 4 November 2022 seeking to better understand its view on specific aspects of the consultation paper and selected submissions regarding grid reliability.
The Authority considers that Transpower is uniquely placed to express a view on this matter.
Transpower responded on 10 November 2022. To ensure that it has all relevant viewpoints before it, the Authority now welcomes any feedback from interested parties on Transpower’s response below. Please provide any feedback to network.pricing@ea.govt.nz by 4pm on Friday, 25 November 2022.
The consultation documentation, and the initial submissions and cross-submissions received, can be accessed belowIf you would like to get in touch with the Authority with questions on this consultation please contact network.pricing@ea.govt.nz
-
Household bills impact of proposed ACOT reform
Household-bill-impacts-of-proposed-ACOT-reform.xlsx (XLSX, 312 KB)
Last updated: 16 September 2022
-
ACOT - Transpower response - grid reliability
ACOT-Transpower-response-grid-reliability.pdf (PDF, 219 KB)
Last updated: 17 November 2022
Feedback on Transpower response - Grid reliability
-
Download a ZIP file containing all documents
-
Horizon Networks - Feedback on Transpower response – grid reliability - 1382909
Horizon-Networks-Feedback-on-Transpower-response-grid-reliability-1382909-v2.pdf (PDF, 184 KB)
Last updated: 23 December 2022
-
IEGA - Feedback on Transpower response – grid reliability - 1382910
IEGA-Feedback-on-Transpower-response-grid-reliability-1382910-v2.pdf (PDF, 1024 KB)
Last updated: 23 December 2022
-
Manawa Energy - Feedback on Transpower response – grid reliability - 1382911
Manawa-Energy-Feedback-on-Transpower-response-grid-reliability-1382911-v2.pdf (PDF, 184 KB)
Last updated: 23 December 2022
-
Northpower - Feedback on Transpower response – grid reliability - 1382912
Northpower-Feedback-on-Transpower-response-grid-reliability-1382912-v2.pdf (PDF, 238 KB)
Last updated: 23 December 2022
-
Top Energy - Feedback on Transpower response – grid reliability - 1382913
Top-Energy-Feedback-on-Transpower-response-grid-reliability-1382913-v2.pdf (PDF, 309 KB)
Last updated: 23 December 2022
Consultation Papers
-
Consultation Paper - ACOT
Consultation-paper-ACOT-review.pdf (PDF, 691 KB)
Last updated: 16 September 2022
Cross submissions
-
Download a ZIP file containing all documents
-
Electra - 2022 ACOT Cross-submission
Electra-2022-ACOT-Cross-submission.pdf (PDF, 266 KB)
Last updated: 17 November 2022
-
Horizon Networks - 2022 ACOT Cross-submission
Horizon-Networks-2022-ACOT-Cross-submission.pdf (PDF, 201 KB)
Last updated: 17 November 2022
-
IEGA - 2022 ACOT Cross-submission
IEGA-2022-ACOT-Cross-submission.pdf (PDF, 1 MB)
Last updated: 17 November 2022
-
Manawa Energy - 2022 ACOT Cross-submission
Manawa-Energy-2022-ACOT-Cross-submission.pdf (PDF, 240 KB)
Last updated: 17 November 2022
-
MEUG - 2022 ACOT Cross-submission
MEUG-2022-ACOT-Cross-submission.pdf (PDF, 146 KB)
Last updated: 17 November 2022
-
Transpower - 2022 ACOT Cross-submission
Transpower-2022-ACOT-Cross-submission.pdf (PDF, 99 KB)
Last updated: 17 November 2022
-
Vector - 2022 ACOT Cross-submission
Vector-2022-ACOT-Cross-submission.pdf (PDF, 171 KB)
Last updated: 17 November 2022
Submissions
-
Download a ZIP file containing all documents
-
Aurora 20221020 Submission – ACOT (Final)
20221020-Aurora-Submission-ACOT-Final.pdf (PDF, 279 KB)
Last updated: 21 October 2022
-
Consultation Paper— consultation on ACOT payments to distributed generation (WEL Networks)
Last updated: 21 October 2022
-
EA Networks - ACOT Submission Sept 2022_2
EA-Networks-ACOT-Submission-Sept-2022_2.pdf (PDF, 1 MB)
Last updated: 21 October 2022
-
Electra Submission EA ACOT Consultation 20 October 2022
Electra-Submission-EA-ACOT-Consultation-20-October-2022.pdf (PDF, 3.8 MB)
Last updated: 21 October 2022
-
ETNZ ACOT submission October 2022
ETNZ-ACOT-submission-October-2022.pdf (PDF, 188 KB)
Last updated: 21 October 2022
-
Horizon Networks ACOT Submission
Horizon-Networks-ACOT-Submission.pdf (PDF, 646 KB)
Last updated: 21 October 2022
-
IEGA submission to EA - ACOT payments to DG 20 Oct 2022
IEGA-submission-to-EA-ACOT-payments-to-DG-20-Oct-2022.pdf (PDF, 1.3 MB)
Last updated: 21 October 2022
-
KCE submission on ACOT Final
KCE-submission-on-ACOT-Final.pdf (PDF, 1.4 MB)
Last updated: 21 October 2022
-
Manawa Energy - Submission on ACOT Code change FINAL
Manawa-Energy-Submission-on-ACOT-Code-change-FINAL.pdf (PDF, 210 KB)
Last updated: 21 October 2022
-
Manawa Energy Submission on ACOT Change + Appendix 1 TLG Report, Appendix 2 Kaimai Case Study
Last updated: 22 December 2022
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
© 2023 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.