-
Extended reserve Code amendment
Closed
13 Apr – 11 May 2021
9 submissions received (view submissions)
The Authority is consulting on amending the extended reserve Code obligations.
The intent of the amendment is to transition the North Island AUFLS scheme to the system operator’s proposed 4-block scheme and to make explicit the testing requirements for the AUFLS systems.
The proposal will require North Island distributors to pro-actively engage with the system operator to transition their AUFLS systems to the 4-block scheme no later than June 2025.
This amendment will also re-state the AUFLS relay testing requirements removed from the Code in the 2016 Extended reserve Code amendment.
Exemptions currently held by a number of large consumers in the North Island will expire on 30 June 2022. Current exemption holders must either become compliant or successfully apply for an equivalence arrangement from the system operator ahead of their exemption expiration.
No change to the South Island AUFLS scheme or responsibility for provision is proposed.
Consultation Papers
-
Download a ZIP file containing all documents
-
Appendix A System Operator AUFLS status letter
Extended-reserve-consultation-Appendix-A-SO-AUFLS-status-letter-Apr21.pdf (PDF, 156 KB)
Last updated: 12 April 2021
-
Appendix D - AUFLS scheme change Cost Benefit Assessment
Extended-reserve-consultation-appendix-D-CBA-Apr21.pdf (PDF, 380 KB)
Last updated: 12 April 2021
-
Extended Reserve Code amendment consultation paper
Extended-reserve-Code-amendment-consultation-Apr21.pdf (PDF, 870 KB)
Last updated: 12 April 2021
Submissions
-
Download a ZIP file containing all documents
-
Mercury
Mercury-Extended-reserve-submission.pdf (PDF, 110 KB)
Last updated: 17 May 2021
-
MEUG
MEUG-Extended-reserve-submission.pdf (PDF, 181 KB)
Last updated: 17 May 2021
-
New Zealand Steel
New-Zealand-Steel-Extended-reserve-submission.pdf (PDF, 196 KB)
Last updated: 17 May 2021
-
Northpower
Northpower-Extended-reserve-submission.pdf (PDF, 236 KB)
Last updated: 17 May 2021
-
Powerco
Powerco-Extended-reserve-submission.pdf (PDF, 95 KB)
Last updated: 17 May 2021
-
Transpower
Transpower-Extended-reserve-submission.pdf (PDF, 91 KB)
Last updated: 17 May 2021
-
Trustpower - Extended reserve consultation question
Trustpower-Extended-reserve-question.pdf (PDF, 75 KB)
Last updated: 17 May 2021
-
Vector
Vector-Extended-reserve-submission.pdf (PDF, 141 KB)
Last updated: 17 May 2021
-
Winstone Pulp International
Winstone-Pulp-International-Extended-reserve-submission.pdf (PDF, 850 KB)
Last updated: 17 May 2021
-
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
© 2023 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.