Efficient procurement of extended reserve
The Authority has progressed with making significant changes to the way that participants are required to provide automatic under-frequency load shedding (AUFLS).
AUFLS are the blocks of load that are automatically disconnected during large under-frequency events in the New Zealand electrical system.
The changes will significantly improve the efficiency and reliability of the extended reserve regime, because the load with best relative suitability would be selected for the service. The Authority has appointed NZX Limited as the extended reserve manager to progress the development of the selection methodology and the creation of the procurement schedule.
The Authority will organise a series of three interactive workshops with North Island distributors and consumers with load directly connected to the grid to gather feedback on a number of topics. After these workshops, the extended reserve manager will consult on the methodology and the procurement schedule and the system operator will consult on the technical requirements schedule before finalising them.
Although AUFLS is currently the only type of extended reserve product, the Authority has adopted the more generic term (ie, extended reserve) so as to not limit the introduction of other products and services in the future.
Overview
Date | Activity |
---|---|
17 Apr 2018 | Development: Extended reserve project update Read more |
17 Oct 2017 | Development: Extended reserve project update Read more |
21 Feb 2017 | Development: Decision paper on efficient procurement of extended reserve Read more |
11 Oct – 29 Nov 2016 | Consultation: NZX consultation - Draft extended reserve selection methodology Read more |
11 Oct – 29 Nov 2016 | Consultation: System operator consultation - Draft extended reserve technical requirements schedule Read more |
23 Aug – 04 Oct 2016 | Consultation: Consultation on proposed extended reserve Code amendments Read more |
Apr 2016 | Event: Papers from extended reserve workshop 3 Read more |
Nov 2015 | Event: Papers from extended reserve workshop 2 Read more |
Sep 2015 | Event: Papers from extended reserve workshop 1 Read more |
14 Jul 2015 | Implementation: Authority, extended reserve manager and system operator enter development phase Read more |
17 Mar 2015 | Development: Extended reserve manager liability limits Read more |
25 Nov – 19 Dec 2014 | Consultation: Limiting the liability of the extended reserve manager Read more |
11 Jun 2014 | Development: Decision paper Read more |
6 May 2014 | Event: Workshop on extended reserves consultation Read more |
08 Apr – 20 May 2014 | Consultation: Consultation on extended reserves - draft Code amendment Read more |
21 Jan – 04 Mar 2014 | Consultation: Efficient procurement of extended reserves - second consultation Read more |
14 – 23 Oct 2013 | Event: Workshops on extended reserves Read more |
02 Oct – 14 Nov 2012 | Consultation: Efficient procurement of extended reserves Read more |