HVDC component of Transpower's proposed variation to the Transmission Pricing Methodology
Closed
23 Jun – 14 Jul 2015
12 submissions received (view submissions)
In response to the Authority referring back some of Transpower’s components of its proposed variation to the TPM, Transpower resubmitted the HVDC charging component of its proposal (unchanged).
This component proposes to change the allocation of HVDC costs to South Island generators from a peak (MW) to an average (MWh) injection. We consider that the HVDC component should improve the operational efficiency of the electricity industry because it would address incentives for some South Island generators to inefficiently withhold generation capacity during periods when it’s needed .
Transpower recommends working with the Authority to develop a component to provide for de-rating the HVDC charge in relation to injection in the Upper South Island before any de-rating change could be introduced.
We accept there are significant design issues to address in relation to de-rating the HVDC charge in the Upper South Island before we could consider this component. Therefore, we are now consulting on the resubmitted HVDC component.
Consultation Papers
-
Appendix B: Proposed Code amendment
Last updated: 24 June 2015
-
Consultation Paper - HVDC component of Transpower’s proposed variation to the Transmission Pricing Methodology
HVDC-component-of-Transpowers-proposed-variatiation-to-the-TPM.pdf (PDF, 328 KB)
Last updated: 24 June 2015
Summary of submissions
-
Appendix A - Drafting showing proposed changes to the Electricity Industry Participation Code 2010
Appendix-A-HVDC.pdf (PDF, 276 KB)
Last updated: 25 August 2015
-
Decisions and reasons paper - HVDC component of Transpower’s proposed variation to the Transmission Pricing Methodology
HVDC-decisions-and-reasons.pdf (PDF, 130 KB)
Last updated: 25 August 2015
-
Summary of submissions
HVDC-summary-of-submissions.pdf (PDF, 74 KB)
Last updated: 25 August 2015
Submissions
-
Download a ZIP file containing all documents
-
Contact Energy
Last updated: 28 July 2015
-
Fonterra
Last updated: 28 July 2015
-
Genesis Energy
Last updated: 28 July 2015
-
Genesis Energy - Castalia addendum
Genesis-Castalia.pdf (PDF, 163 KB)
Last updated: 28 July 2015
-
Major Electricity Users' Group
Last updated: 28 July 2015
-
Meridian Energy
Last updated: 28 July 2015
-
Mighty River Power
Last updated: 28 July 2015
-
Pioneer Generation
Last updated: 28 July 2015
-
Powerco
Last updated: 28 July 2015
-
Transpower
Last updated: 28 July 2015
-
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
© 2023 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.