October 2012 Issues Paper: Modelling Workshop
We held a modelling workshop about its TPM proposal on Tuesday, 4 December 2012 in Auckland.
The workshop consisted of two sessions:
- details of the TPM proposal including the SPD method, design issues and RCPI application; and
- direct incidence of charges and generator pass through.
-
Download a ZIP file containing all documents
-
Agenda
Modelling-workshop-agenda.pdf (PDF, 58 KB)
Last updated: 18 August 2016
-
Presentation by Electricity Authority – SPD method
EA-SPD-method.pdf (PDF, 2.8 MB)
Last updated: 18 August 2016
-
Presentation by Transpower NZ Ltd – Transpower’s modelling work: SPD
Transpower-modelling-SPD-method.pdf (PDF, 589 KB)
Last updated: 18 August 2016
-
Presentation by Electricity Authority – Incidence and generator pass through
EA-Incidence-and-pass-through.pdf (PDF, 1.4 MB)
Last updated: 26 June 2015
-
Presentation by Transpower NZ Ltd – Transpower’s modelling work: asset groups
transpower-modelling-assets.pdf (PDF, 659 KB)
Last updated: 18 August 2016
-
Additional Slides 1 – Using TPMvSPD and GDX files
EA-additional-slides-1.pdf (PDF, 1 MB)
Last updated: 26 June 2015
-
Additional slides 2 – Changes in line company area end-user charges
EA-additional-slides-2.pdf (PDF, 625 KB)
Last updated: 26 June 2015