Stage 2 Options
As part of the second stage of this review a consultation paper on stage 2 options has been published with supporting appendices.
In response to queries about flow tracing from participants during the consultation period, the Commission published a draft report, "Transpower Asset Usage 2004 - 2008". It includes:
- a brief overview of the flow-tracing approach (which is quite different to the marginal power flow allocation used as the basis for the Transmission Pricing Methodology some years ago); and
- illustrations of the electrical energy usage of assets on Transpower's network, divided among the constituent customers.
-
Revised transmission review process November 2010
Revised-transmission-review-process-Nov10.pdf (PDF, 65 KB)
Last updated: 19 August 2016
-
Transpower Asset Usage 2004 2008 updated 4 November 2010
Transpower-Asset-Usage-2004-2008-updated-4-November-2010.pdf (PDF, 7.8 MB)
Last updated: 19 August 2016