Correspondence following the release of the 2020 TPM Guidelines
Contact Energy letter to the Authority and the Authority's response
-
Contact Energy letter to the Authority
Contact-Energy-letter-to-the-Authority.pdf (PDF, 143 KB)
Last updated: 29 January 2021
-
Authority response to Contact Energy
Authority-response-to-Contact-Energy.pdf (PDF, 145 KB)
Last updated: 29 January 2021
Entrust, IEGA, Trustpower and Vector letters to the Authority, and the Authority's response
-
Download a ZIP file containing all documents
-
Entrust letter to the Authority
2020-05-20-Entrust.pdf (PDF, 273 KB)
Last updated: 29 January 2021
-
IEGA letter to the Authority
2020-05-28-IEGA-letter.pdf (PDF, 334 KB)
Last updated: 29 January 2021
-
Trustpower letter to the Authority
Trustpower-letter-to-the-Authority.pdf (PDF, 334 KB)
Last updated: 29 January 2021
-
Vector letter to the Authority
2020-05-20-Vector.pdf (PDF, 1.6 MB)
Last updated: 29 January 2021
-
Authority response to Entrust, IEGA, Trustpower and Vector
Correspondence-with-Entrust-IEGA-Trustpower-and-Vector.pdf (PDF, 663 KB)
Last updated: 29 January 2021
TPM Group letter and response from Transpower and the Authority
The TPM Group wrote to Transpower about the implementation of the 2020 transmission pricing methodology. The letter from the TPM Group and Transpower's response can be read here, while the Authority's response is available below.
-
Authority's response to TPM Group
TPM-Group-letter-and-response-from-Transpower-and-the-Authority.pdf (PDF, 137 KB)
Last updated: 29 January 2021