-
Removing constrained on payments for generation ramping down
Closed
26 Mar – 30 Apr 2019
6 submissions received (view submissions)
We consulted on a proposed amendment which inserts a new clause in Part 13 of the Code to stop constrained on payments to ramp-constrained generators when they are dispatched down at their maximum ramp rate. Generators would instead be paid the nodal price. In all other respects constrained on payments would not change.
Consultation Papers
-
Proposal for removing constrained on payments for generation ramping down
Proposal-for-removing-constrained-on-payments-for-generation-ramping-down.pdf (PDF, 1.4 MB)
Last updated: 26 March 2019
Submissions
-
Download a ZIP file containing all documents
-
Mercury.pdf
Last updated: 14 May 2019
-
Meridian.pdf
Last updated: 14 May 2019
-
MEUG.pdf
Last updated: 14 May 2019
-
Nova.pdf
Last updated: 14 May 2019
-
Transpower.pdf
Last updated: 14 May 2019
-
Trustpower.pdf
Last updated: 14 May 2019
-
Contact Us
EMAIL: info@ea.govt.nz
Sign up to our newsletter
© 2023 Copyright material on this site is protected by copyright owned by the Electricity Authority or its licensors. Full copyright statement.