The Electricity Authority will decide which existing distributed generation will receive avoided cost of transmission (ACOT) payments under the regulated terms in Schedule 6.4 of the Electricity Industry Participation Code 2010 (Code) based on the advice of Transpower.
Overview
Date | Activity |
---|---|
1 Jul 2019 | Development: Two additions to the list of distributed generation eligible to qualify to receive ACOT in the upper North Island Read more |
5 Feb 2019 | Development: We published the lists of distributed generation in the upper North Island, and in the upper South Island. Read more |
28 Aug – 09 Oct 2018 | Consultation: Two lists of distributed generation eligible to receive ACOT – upper North Island and upper South Island Read more |
28 Aug 2018 | Development: We have published the List of distributed generation in the lower North Island that is eligible to qualify for avoided cost of transmission (ACOT) payments under the regulated terms. Read more |
22 May – 03 Jul 2018 | Consultation: List of distributed generation eligible to qualify to receive ACOT, lower North Island Read more |
27 Mar 2018 | Development: We published the list of distributed generation in the lower South Island that is eligible to qualify for avoided costs… Read more |
05 Dec 2017 – 30 Jan 2018 | Consultation: List of distributed generation eligible to qualify to receive ACOT, lower South Island Read more |
Jun – Aug 2017 | Correspondence: Correspondence with Meridian Read more |
Feb – Mar 2017 | Correspondence: Correspondence with Transpower Read more |