Proposed guideline for connection and electrical connection
The Authority is seeking feedback on a proposed guideline for connecting and electrically connecting points of connection.
The connection and electrical connection guidelines (guidelines) provide an operational view of the processes for connecting and electrically connecting of network supply points (NSPs) and installation control points (ICPs). The Code requirements for these processes are contained in Parts 10 and 11 of the Electricity Industry Participation Code 2010 (Code). These guidelines also set out best practice for new connections that are ICPs.
Overview
Date | Activity |
---|---|
26 Jun 2018 | Development: Summary of submission: Connection and electrical connection guidelines Read more |
26 Jun 2018 | Outcome: We have completed our review and amended the Connection and electrical connection guidelines. Read more |
10 Apr – 08 May 2018 | Consultation: Connection and electrical connection guidelines Read more |