13 December 2017
The Security and Reliability Council met on 13 December 2017 to discuss the 2 March 2017 power system event in which the South Island grid split into two electrical islands and upper South Island automatic under-frequency load shedding was triggered.
-
Agenda
Last updated: 03 July 2018
-
Future schedule
SRC06-Future-schedule.pdf (PDF, 107 KB)
Last updated: 03 July 2018