28 March
A special meeting of the Security and Reliablility Council (SRC) was held on 28 March 2012.
At this meeting, the SRC considered a report from Transpower on the event at the Huntly substation on 13 December 2011 and the resulting under-frequency situation and operation of the automatic under-frequency load shedding (AUFLS) system.
-
Download a ZIP file containing all documents
-
System Operator presentation
SO-presentation.PDF (PDF, 1.1 MB)
Last updated: 19 August 2016
-
Market performance presentation
Market-performance-presentation.pdf (PDF, 202 KB)
Last updated: 19 August 2016
-
Authority letter to Transpower requesting the report
Letter-to-Transpower-re-requesting-report.pdf (PDF, 752 KB)
Last updated: 27 June 2015
-
Draft market performance report
Draft-market-performance-report.pdf (PDF, 1.3 MB)
Last updated: 19 August 2016
-
Cover paper
Last updated: 19 August 2016
-
Agenda
Last updated: 19 August 2016
-
Transpower report (System Operator)
Transpower-report-System-Operator.pdf (PDF, 281 KB)
Last updated: 19 August 2016
-
SRC letter to Authority Board
SRC-letter-to-Authority-Board.pdf (PDF, 48 KB)
Last updated: 19 August 2016
-
Transpower report (Grid Owner)
Transpower-report-Grid-Owner.pdf (PDF, 598 KB)
Last updated: 19 August 2016