10 May
On 10 may the Locational Price Risk Technical Group discussed the proposed FTR allocation plan, monthly rental guides and allocation of transformed rentals post-introduction of financial transmission rights.
-
Download a ZIP file containing all documents
-
FTR allocation plan
FTR-allocation-plan.pdf (PDF, 2.1 MB)
Last updated: 19 August 2016
-
Discussion paper: Allocation of transformed rentals post introduction of financial transmission rights
Discussion-Paper-options-for-allocating-residuals-DH.pdf (PDF, 139 KB)
Last updated: 19 August 2016
-
Late offload example
Late-Offload-example.xls (XLS, 99 KB)
Last updated: 27 June 2015
-
Presentation by EMS: Consultation on proposed FTR allocation plan 2012
Presentation-Consultation-proposed-FTR-allocation-plan-2012.pdf (PDF, 1.5 MB)
Last updated: 19 August 2016
-
Presentation by the Electricity Authority: Scaling and secondary trading provisions for FTRs
Presentation-Scaling-and-secondary-trading.pdf (PDF, 321 KB)
Last updated: 19 August 2016
-
Amount of LCE against monthly rental guides
LCE-vs-Rental-Guides.xls (XLS, 16 KB)
Last updated: 27 June 2015
-
Cover paper
Last updated: 19 August 2016
-
Minutes of the previous meeting
minutes-previous-meeting.pdf (PDF, 49 KB)
Last updated: 19 August 2016
-
Agenda
Last updated: 19 August 2016