Consultation on proposed guidelines for connection and electrical connection closes today
We have published a consultation paper on our proposed connection and electrical connection guidelines. The guidelines discuss the process and Code requirements for connecting a point of connection (POC) to a network, and the subsequent electrical connection of the POC.
Started 10/04/2018; Ending: 08/05/2018
Consultation on proposed amendments to enable the system operator’s Dispatch Service Enhancement (DSE) project
We have published a consultation paper on proposed amendments to the Code and the Approved Systems Document that would enable the system operator’s dispatch service enhancement (DSE) project.
The proposed amendments to the Approved Systems Document would allow for the current GENCO software to be replaced as the approved system used to issue electronic dispatch instructions. We also propose amendments to Part 13 of the Code that would increase the benefits from adopting new communication protocols for issuing electronic dispatch instructions.
Started 10/04/2018; Ending: 22/05/2018
Consultation on Permitting Approved Test Houses (ATHs) to amend certification reports
In December 2017, we made an urgent amendment to the Code to enable ATHs to amend certification reports for a metering installation or a metering component. In certain circumstances this would avoid the need to recertify. The urgent Code amendment expires on 12 October 2018. We propose amending the Code permanently, so the effect of the urgent amendment will continue past this date.
Started 24/04/2018; Ending: 05/06/2018