30 August 2010

The following settlement agreement was reached by Genesis Power, the System Operator and Meridian Energy concerning Genesis' failure to have duplicate main protection systems in place for a number of generation assets at the Huntly, Tokaanu and Rangipo power stations, and to report a breach relating to quality and security under Part C of the Electricity Governance Rules.

Settlement - Genesis Power, System Operator, Meridian Energy

16 February 2010

The following settlement agreement was reached by Genesis Power, the System Operator, Norske Skog Tasman, and Meridian Energy concerning Genesis' failure to comply with a dispatch instruction during the commissioning of Huntly Unit 5.

Settlement - Genesis Power, System Operator, Norske Skog Tasman, Meridian Energy

25 November 2009

The following settlement was reached between Contact Energy, the System Operator, Meridian Energy and Mighty River Power in respect of Contact's failure to have correct protection settings in place at the Otahuhu power station.

Settlement - Contact Energy, System Operator, Meridian Energy. Mighty River Power

30 June 2009

The following settlement was reached by the System Operator, Meridian Energy and Genesis Power concerning the System Operator's self-reported breach of a principal performance obligation to “act as a reasonable and prudent system operator with the objective of ensuring frequency time error is not greater than five seconds of New Zealand standard time”.

Settlement - System Operator, Meridian Energy, Genesis Energy

19 May 2009

The following settlement was reached by ESD Power, Simply Energy, Mighty River Power and Genesis Power concerning the creation of new ICPs for a new embedded network where ICPs already existed on the parent network.

Settlement - ESD Power, Simply Energy, Mighty River Power and Genesis Power

31 March 2009

The following settlement was reached by the Grid Owner, Meridian Energy and The Market Place Company as Pricing Manager concerning the provision of incorrect metering information by the Grid Owner to the Pricing Manager for the North Makarewa grid exit point.

Settlement - Grid Owner, Meridian Energy and Pricing Manager

21 October 2008

The following settlement was reached between Stream Information, The Reconciliation Manager, Contact Energy, Energy Market Services, Genesis Power, Meridian Energy, Mighty River Power, TrustPower, and Vircom-EMS concerning Stream Information's compliance with the code of practice for metering installations.

Settlement Stream Information

Appendix: Schedule of Metering Installations

24 July 2008

The following settlement was reached by Carter Holt Harvey, the System Operator, TrustPower, and Meridian Energy concerning Carter Holt Harvey's failure to comply with dispatch instructions issued for the Kinleith power plant.

Settlement - Carter Holt Harvey, System Operator, TrustPower and Meridian

24 July 2008

The following settlement was reached by Genesis Power, the System Operator, Norske Skog Tasman, and Meridian concerning Genesis' failure to comply with dispatch instructions for fast instantaneous reserve (FIR) issued for the Huntly power station and to reasonably estimate the FIR available on seven occasions between 16 January 2005 and 10 October 2006.

Settlement - Genesis Power, System Operator, Norske Skog Tasman and Meridian

2 April 2008

The following settlement was reached by the System Operator, the Grid Owner, Vector, Norske Skog Tasman and Meridian Energy concerning the System Operator's failure to issue a Grid Emergency Notice as soon as practicable after declaring a nationwide grid emergency at 17:34 on 19 June 2006.

Settlement - System Operator, Grid Owner, Vector, Norske Skog Tasman and Meridian

2 April 2008

The following settlement was reached by the Grid Owner, Genesis Power, Contact Energy and Meridian Energy concerning the Grid Owner's failure to declare a SCADA situation existed and to provide corrected data to the Pricing Manager for the Tauranga grid exit point for 19 June 2006.

Settlement - Grid Owner, Genesis, Contact and Meridian

2 April 2008

The following settlement was reached by The Market Place Company as Clearing Manager, Genesis Energy and Contact Energy in respect of self reported and admitted breaches of the Electricity Governance Rules and the Electricity Governance Regulations by the Clearing Manager. The rule breaches concerned the calculation and publishing of incorrect constrained on and off payments and the regulation breach concerned not having a change to the software audited.

Settlement - Clearing Manager, Contact and Genesis

31 October 2007

The following settlement was reached by Meridian Energy, Electricity Ashburton and Orion New Zealand concerning Electricity Ashburton's incorrect reconciliation of ten installation control points between the network supply points ASB0661 and COL0111 from 1 March 2004.

Settlement - Electricity Ashburton, Meridian and Orion

31 October 2007

The following settlement was reached by Meridian Energy and Powerco concerning Powerco's creation of an installation control point for the Puke Ariki Library in Taranaki on 1 March 2004.

Settlement - Meridian and Powerco

18 September 2007

The following settlement was reached between Unison Networks, the System Operator, Vector and Norske Skog Tasman concerning Unison Networks' reserve offers and compliance with dispatch instructions issued to Unison Networks on 8 November 2006 and 1 December 2006.

Settlement - Unison Networks, System Operator, Transpower, Vector, Norske Skog

13 August 2007

The following settlement was reached by Meridian Energy, Norske Skog Tasman and the System Operator concerning Meridian's reserve offers and compliance with dispatch instructions issued to the Waitaki River Block on 4 December 2005.

Settlement - Meridian Energy, System Operator, Transpower and Norske Skog Tasman

27 June 2007

The following settlement agreement was reached by Meridian Energy, the System Operator, Contact Energy, and Norske Skog Tasman concerning the System Operator applying an incorrect constraint to the Scheduling Pricing and Dispatch software model for the Wairakei-Whakamaru circuit for the period 9 March 2005 to 22 December 2005.

Settlement - System Operator, Meridian Energy, Norske Skog Tasman, Contact Energy and Genesis Energy

27 June 2007

The following settlement was reached by Buller Electricity, Meridian Energy and TrustPower concerning Buller Electricity's population and correction of information contained within the Registry on 1 March 2004.

Settlement - Meridian Energy, TrustPower and Buller Electricity

1 May 2007

The following settlement was reached by Mighty River Power, the System Operator, Meridian Energy, and TrustPower concerning Mighty River Power's compliance with dispatch instructions issued to the Southdown power station on 8 June 2006.

Settlement - Mighty River Power, System Operator, Meridian and TrustPower

31 January 2007

The following settlement was reached by the System Operator and Mighty River Power concerning Mighty River Power's compliance with dispatch instructions issued to the Mokai power station on three occasions in July-October 2005.

Settlement - Mighty River Power and System Operator

15 January 2007

The following settlement was reached by Vector, the System Operator, Meridian Energy, Genesis Power, Norske Skog Tasman, Mighty River Power, TrustPower and Rio Tinto Aluminium New Zealand concerning Vector providing reserves during an under-frequency event on 1 July 2005.

Settlement - Vector, System Operator, Meridian, Genesis, Norske Skog, Mighty River Power, Trustpower and Rio Tinto Aluminium

11 December 2006

The following settlement was reached by Unison Networks, the System Operator, Meridian Energy, Vector, Genesis Power and Norske Skog Tasman concerning Unison Networks providing reserves during an under-frequency event.

Settlement - System Operator, Unison, Genesis, Meridian, Vector and Norske Skog

20 June 2006

The following settlement was reached by the Grid Owner, Todd Energy, Contact Energy and Meridian Energy concerning the Grid Owner's provision of metering information for the Papanui grid exit point on 4 and 5 December 2004.

Settlement - System Operator, Todd, Contact Energy, Meridian Energy

31 May 2006

The following settlement agreement was reached between Todd Energy, the System Operator, Meridian Energy, Comalco NZ, Carter Holt Harvey and Norske Skog Tasman concerning Todd Energy's compliance with a dispatch instruction for Kapuni generation on 11 May 2004.

Settlement - Todd Energy, System Operator, Meridian Energy, Comalco, Carter Holt Harvey and Norske Skog Tasman

31 May 2006

The following settlement was reached by the Grid Owner, The Market Place Company, Contact Energy and Meridian Energy concerning alleged breaches of the Electricity Governance Rules by the Grid Owner and the Pricing Manager relating to high prices at OTA1101 and OTA1102 for trading periods 1 and 7 on 5 June 2005.

Settlement - Grid Owner, Pricing Manager, Contact and Meridian

9th November 2005

The following settlement was reached by the Grid Owner and Powerco concerning a self reported breach of the Electricity Governance Rules by the Grid Owner. This concerned metering information for the Bunnythorpe and Linton grid exit points on 1-3 October 2004.

Settlement - Grid Owner and Powerco

30th September 2005

The following settlement was reached by the Grid Owner and Meridian Energy in respect of a self reported breach of the Electricity Governance Rules 2003 by the Grid Owner. This concerned metering information for the Moturoa grid exit point on 3 and 4 June 2004.

Settlement - Grid Owner and Meridian Energy Ltd

19th October 2005

The following settlement was reached by the System Operator and the Grid Owner in respect of an alleged breach of the Electricity Governance Rules by the Grid Owner concerning not achieving coordination and selectiveness of the relay protection of the Cobb - Upper Takaka - Motueka - Stoke circuits from1 March 2004 to 10 January 2005.

Settlement - Grid Owner Cobb Valley

30th September 2005

The following settlement was reached by Meridian Energy, Contact Energy, Norske Skog Tasman and the Grid Owner concerning the System Operator's notification of a constraint in relation to an extended outage of the Bromley Islington 1 circuit on 25 March 2004.

Settlement - System Operator, Grid Owner, Meridian, Contact and Norske Skog Tasman

26 July 2005

The following settlement was reached by the System Operator, Genesis Power, Meridian Energy, Norske Skog Tasman, TrustPower and Mighty River Power concerning the System Operator's grid emergency notification and the removal of permanent constraints in relation to events surrounding the Bay of Plenty undesirable trading situation on or about 22 April 2004.

Settlement - System Operator, Genesis, Meridian, Norske Skog Tasman and Mighty River Power

26 May 2005

The following settlement was reached by the System Operator, NZ Steel and Genesis Power concerning New Zealand Steel's under-supply of interruptible load for under-frequency requirements in certain trading periods on 4 May 2004.

Settlement New Zealand Steel, System Operator and Genesis

The following settlement was reached by the System Operator, Northpower and Genesis Power concerning Northpower's under-supply of interruptible load for under-frequency requirements in certain trading periods on 4 May 2004.

Settlement Northpower, System Operator and Genesis

The following settlement was reached by the System Operator, Powerco, and Genesis Power concerning Powerco's under-supply of interruptible load for under-frequency requirements in certain trading periods on 4 May 2004.

Settlement PowerCo

The following settlement was reached by the System Operator, TrustPower and Genesis Power concerning TrustPower's under-supply of interruptible load for under-frequency requirements in certain trading periods on 4 May 2004.

Settlement Trustpower

10 March, 11 March and 29 June 2004

The following settlement was reached by the System Operator, Norske Skog Tasman, Genesis Power, Vector, Todd Energy, TrustPower, NZ Steel, Mighty River Power, Contact Energy and Winstone Pulp NZ concerning the System Operator's reduction in instantaneous reserves requirements to zero in certain trading periods on 10 March, 11 March and 29 June 2004.

Settlement - System Operator

2 July 2004

The following settlement was reached by the System Operator, Orion NZ, and Network Tasman concerning Orion NZ's regarding response to load shedding on 2 July 2004.

Settlement - Orion